I have not been keeping this post update, so I will start where I left off. Keep in mind, what you see might not be there anymore. I went through a lot of decisions and changes. So here goes:
I can't believe that's it has been so long since I've posted anything. It's even harder to believe that the layout hasn't progressed any further than it has; especially since I'm retired.
Well, for an update, I've defined the layout boundaries and heights by adding the fascia. There was going to be a highway overpass on the right hand corner; but I pulled the tunnel portal out of the mountain and re-plastered it. The switches on the left hand side are in an wired for future use. The big red switch turns off all power and 120 volt outlets to the layout. I liked the looks of a rocker switch so they turn on-and-off the sound effect systems that I have installed. The other set of rockers will control all of the lighting effects. The lone rocker is for the end of the line programming track. The slider switch is going to control the LED lighting.
I can't believe that's it has been so long since I've posted anything. It's even harder to believe that the layout hasn't progressed any further than it has; especially since I'm retired.
Well, for an update, I've defined the layout boundaries and heights by adding the fascia. There was going to be a highway overpass on the right hand corner; but I pulled the tunnel portal out of the mountain and re-plastered it. The switches on the left hand side are in an wired for future use. The big red switch turns off all power and 120 volt outlets to the layout. I liked the looks of a rocker switch so they turn on-and-off the sound effect systems that I have installed. The other set of rockers will control all of the lighting effects. The lone rocker is for the end of the line programming track. The slider switch is going to control the LED lighting.