I next built the floor framing. I used 2X10s and glued them to the bottom side of the horizontal supports.
Prior to the glue drying, I used a cut end of a 6X6 to run the edge and remove any lasting glue.
Prior to the glue drying, I used a cut end of a 6X6 to run the edge and remove any lasting glue.