I've just laid down a -level- plywood subbase for the creek. But in so doing, I've created gaps between that plywood and the existing scenery.
IMG_1918.jpeg
How should I fill those gaps, given I want to pour "water" (Envirotex or Magic Water). I was thinking masking tape, then plaster wrap, and finish with a coat of Sculptamold to cover the plywood and fill in up to the existing rock work.
Thoughts/Suggestions?
dave
I had forgotten how I set up the bridge abutments. The wood is slightly skewed compared to the stone bridge's abutment, but that's easy to fill (no structural concerns there.)
IMG_1919.jpeg
The back abutments (wood pony truss is the actual bridge here) will need more work.
IMG_1920.jpeg
dave