Superior & Seattle Railroad Build (Volume 2) Started 2/25/17

Started by S&S RR, February 25, 2017, 10:03:31 PM

Previous topic - Next topic

S&S RR

I also got started with the details for the Mackenzie build. Here I'm installing the waterwheel and flume.


John Siekirk
Superior & Seattle Railroad

EricQuebec

What a nice building, very well done.
Can't wait to begin my own....
Eric

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

Jerry

"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

S&S RR

Quote from: EricQuebec on March 03, 2018, 08:48:21 AM
What a nice building, very well done.
Can't wait to begin my own....
Eric


Eric


Thanks - This has been a very fun build. I'm looking forward to the final pictures of it on the layout.
John Siekirk
Superior & Seattle Railroad

S&S RR

John Siekirk
Superior & Seattle Railroad

S&S RR

Quote from: Jerry on March 03, 2018, 04:23:25 PM
You did the wall justice great job.


Jerry


Thanks Jerry - now for all the junk that will cover most of it up. ;)
John Siekirk
Superior & Seattle Railroad

S&S RR

I added the dirt base for the junk yard today. I also started adding the interior details - the steam engine, and some work benches have been glued in.  The HO figure laying between the locomotive inspection pits is my height gauge for hanging tools and equipment on the walls.




John Siekirk
Superior & Seattle Railroad

S&S RR

I also added the dirt and more details to the Mackenzie build. The chimney's were added along with the loose bricks falling all over the roof from the chimney that's on it's way down. The boat casting is very detailed, including a rat. The dried up pond area for this build is going to take a lot of work but I think it's going to be worth it.


John Siekirk
Superior & Seattle Railroad


S&S RR

Quote from: jimmillho on March 03, 2018, 09:53:07 PM
Looking good John.

Jim


Thanks for stopping by the thread Jim. We are at the fun part of these builds where every day brings more details.
John Siekirk
Superior & Seattle Railroad

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

S&S RR

John Siekirk
Superior & Seattle Railroad

S&S RR

I started installing the belt drive system in the Locomotive Works, today. I'll post some pictures when I get further along.  Lots of measuring and measuring again, and then some cutting. At least I have a plan now,  we will see if I can implement it.
John Siekirk
Superior & Seattle Railroad

S&S RR

I was working on some track changes today and decided to cut the base board for the Yard Tower build.  This is the location where it will be planted on the layout.  Two FSM kits are planned just to the right in the space in the picture.  Sewall's Foundry will be just to the right and Fox Run Milling will be next door.



John Siekirk
Superior & Seattle Railroad

Powered by EzPortal