Wichendon Machine Shop (restart)

Started by deemery, May 12, 2025, 12:43:22 PM

Previous topic - Next topic

deemery

Most of the windows now have glazing. 
IMG_1194.jpeg
The 2 paired windows at the bottom go into the attic gables, That's why they're a different casting, with different framing, than the rest of the windows.

I still need to do the door glazing, and the windows for the boiler shop.  But that's small potatoes.  Before I install these, I'll go back and add a touch or two of window glue to the corners, to help lock the glazing into position.  I don't want it to pop out after the structure is assembled.  That would be A Bad Thing.

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Larry C

Dave the windows look great and there certainly are a lot of them; have fun.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Project: Hank's Machine Shop

http://www.ussvigilant.blogspot.com

friscomike

Howdy Dave, nice work on the windows, and good luck with the remaining glazing.  Have fun, mike
My current build is the Oil Derrick and miscellaneous rolling stock .

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

Dave Buchholz

Thanks for the glazing instructions.
My technique has always been poor. Too much glue everywhere

Fifth Dave to the right.
New home of the North Coast Railroad, along the shores of Lake Ontario

Powered by EzPortal