Winter Challenge 25-26 - Fiordland Lobster Company - Tellynott Depot

Started by Mark Dalrymple, January 05, 2026, 09:01:42 PM

Previous topic - Next topic

Mark Dalrymple

Continuing...

Photo 13 - Here is the back wall assembled with corner trim added.  I added corner trim in green below the triangular jut out.  This will sit against the aerial walkover.
IMG20260319163856c.jpg

Photo 14 - Here are the four main walls assembled.
IMG20260321162714c.jpg

Photo 15 - A view from the right front corner.
IMG20260321162719c.jpg

Photo 16 - A view from the back left.
IMG20260321162731c.jpg

Photo 17 - A straight on view from the front at height.
IMG20260321164556c.jpg

Photo 18 - A angled view from the front left.
IMG20260321164605c.jpg

More soon, cheers, Mark.

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

deemery

Mark, how did you notch the styrene floor for the bracing?

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Mark Dalrymple


Mark Dalrymple

Quote from: deemery on March 21, 2026, 07:07:19 PMMark, how did you notch the styrene floor for the bracing?

dave

Hi Dave.

I used by razor saw to cut the cuts at 90 degrees to the edge and then scored and snapped the parallel cuts.

Cheers, Mark.

deemery

Mark, thanks.  I was wondering if you tried one of those plastic nibbler tools. 

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Mark Dalrymple

Hi guys.

Photo 1 - So when I went to add the front wall to the jut out I discovered a problem!  The front wall was considerably taller than the two side walls.  The only thing I can think of is that I made up a smaller vent to start with and decided it looked too narrow so then made up a taller one.  I must have used the wrong one when measuring.  Anyway - it has to be fixed.
IMG20260321173423c.jpg

Photo 2 - After measuring again (!!!) I marked and cut the side wall down.
IMG20260321173442c.jpg

Photo 3 - I used my razor saw to cut off the bracing pieces.
IMG20260321173543c.jpg

Photo 4 - I measured and marked the styrene base and then cut the extra off.
IMG20260321173835c.jpg

Photo 5 - You can see I added a new piece of bracing to the inside of the second side wall before removing the original piece.
IMG20260321174225c.jpg

Photo 6 - I cut the second side wall to size and then added a new piece of 6x6 to the corner.
IMG20260321174401c.jpg

More soon, cheers, Mark.

Mark Dalrymple

Continuing...

Photo 7 - Here is the shortened protrusion.  I actually like the dimensions of this better.
IMG20260321190900c.jpg

Photo 8 - From the other corner.
IMG20260321190908c.jpg

Photo 9- Mocked up with all the vents, doors and windows in place, tilted because they kept falling out.
IMG20260321192336c.jpg

Next up will be to tackle the aerial walkover/ conveyor hallway and tower.

More soon, cheers, Mark.

PRR Modeler

Well done Mark. Scratch building can be interesting at times.
Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

friscomike

Howdy Mark,

The lobster company is progressing well.  Congrats on the fine work.  

Have fun,
mike

Mark Dalrymple

Quote from: PRR Modeler on Today at 12:28:05 PMWell done Mark. Scratch building can be interesting at times.

Thanks, Curt.

Yes.  Sometimes you have to face some unique challenges...

Cheers, Mark.

Mark Dalrymple

Quote from: friscomike on Today at 02:42:52 PMHowdy Mark,

The lobster company is progressing well.  Congrats on the fine work. 

Have fun,
mike

Thanks, Mike.

Its been an interesting project.  Still a lot to do!

Cheers, Mark.