IMMR & T Co.

Started by kyle creel, June 17, 2026, 03:48:24 PM

Previous topic - Next topic

kyle creel

Thanx Phillip, and to all those that opened the posting for a look around... :o  ;D thanx to ya'll too..... ;)  ;)

Well I got busy this morning (Monday) doing a little more 'rough - in' carving and went back over the measurements to correct the width of the main rock formation...it was way too wide.. :o  >:( ...so I carved it back on the right side (if you're facing the layout) and worked a little on the left side as well....although not much came off that area in the way of width, it was more 'shaping'  ;D  ;D  ;) ....The reason for all this 'modification', was in order to start laying out the track work, the open area needed to be a certain 'minimum size' width ;D ... the depth (front to back) was OK but I had to take off about 5-1/2 inches from the centerpiece rock formation..:o ...I decided to go ahead and use the 15-1/2 inch TT that I had; the one I put so much work into 'scratch-bashing' instead of buying a 12-1/2 inch TT... ;D  ;D ...and luckily I had left enough 'room' in the scale track plan for such an eventuality  ;D  ;D  ;D  ;) ...and by 'shifting' some track a bit, I was able to add a siding.. ;)...so now it's back to gluing and then more carving... ;D ...OH YEAUGH, I almost forgot...the TT fit just fine ..and it looks like all the structures will have enough room....and so the plaster 'paper towels' on the risers can begin as soon as the gluing and carving is done..... ;D ...I'd like to finish that by this weekend if possible...... ;D  ;D  ;D  ;) thanx again for stoppin' by......

Here's what I've done so far.....................
I like the way the TT fits in ......
010.JPG

....all the other bldgs.(L.C.*) ;) also fit in just fine..... ;D  ;D  ;D  ;D  ;)
012.JPG
011.JPG
Bubbles likes the progress  :o  ;D  ;D  ;D  ;D  ;) ...........
015.JPG
An overall view......................
014.JPG

That's all for now,...hope ya'll like the progress....I'm not able to 'GO AT IT' like I used to.. :o  >:(  ;D  ;D ....but I'll just keep "pluggin' away", and it'll move right on down the road..... ;D  ;D  ;D  ;D  ;) .......ya'll stop by anytime.... ;D  ;D .....see ya...... 8)  8)  8)  8)  8)

KYLE CREEL
IMMR & T Co.
 

Larry C

Kyle don't feel bad....I don't think any of us can work the way we used to.
Nice progress but you gots some foam carving coming up. Looking good so far
and nice to see the buildings fit in your space.
Current Projects: Pratt's Cove
                           
http://www.ussvigilant.blogspot.com

kyle creel

#62
Thanx Larry C*.....and thanx to anybody that popped in while I was away :o  :o  :o  :o  :o .................

INSTALLING THE TURNTABLE. :o  :o  :o  :o  ;D  ;D  ;)  ;)  ;) ....the little voice in my old and decrepit noggin ::)  :o just wouldn't let 'it' go  :o  ;D  >:(  ;D  >:(  ;D  >:( .....so... :o  :o  "I grabbed my knife and I did it" ;D  ;D  ;D  ;D  ;D  ;) ..."That's my story your honour, and I'm stickin' to it.." ;)  ;)  ;) ........here'it is....................
016.JPG
017.JPG
019.JPG
021.JPG
How's it look??...I know it's not completely leveled....I always install a half of a strip of cork roadbed around the edge under the lip of the TT in order to match the height of the entry/exit track and the whisker tracks...... ;) ...it always works extremely well with this TT....so there it is........Thanx again for stoppin' in....."ya'll sit a spell next time", "and we'll visit proper"... ::)  ::)  ::)  ;D  ;D  ;)  ;).....all for now .....see ya..... 8)  8)  8)  8)  8) .................

KYLE CREEL
IMMR & T Co.

PRR Modeler

Great work on the layout.
Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

friscomike

Howdy Kyle, 

The layout is coming along nicely.  The TT install was a success and looks perfectly placed.  Great work.

If you are like me, mornings are good; the afternoons are nap time.  Persist!

Have fun,
mike

kyle creel

Thanx Curt, and thanx Mike.. ;D  ;D ..also a big ol' thanx to the ones that wandered in for a look around...welcome... ;)  ;)

Today (Wednesday) I got back to work on gluing and shaping more pink foam...this time I worked on the 2 tracks on the left side (facing the layout) that connect to the 2 tracks on the right side of the layout; I needed to get the pink foam (soon to be rockwork) glued in and checked for clearances around the incline / decline ramps  ;D  ;D  ....I also decided not to continue the trackage that was to have gone across the back of the layout above everything and (NOT) continue off the layout via a tunnel... :o  :o  :o this was also the trackage that serviced the I ME MINE in the little town of GEORGE... :o ....Instead ...I decided that it was going to be a royal pain in the ass to switch (too far to reach easily) without moving the layout out from the wall on that end... >:(  >:(  >:(  >:( and I just wasn't going to F%#k around with it.... >:(  >:(  >:(  :o  :o .....so I decided to move the mine over to the left side near the PHARTZ & SCHMELLING BS processing plant... ;D  ;D  ::)  ::) .....now I'll just have a gravel & dirt road that connects PEAU - DUNQUE Jct. to GEORGE, I decided to include a very short length of std. gauge track at GEORGE as an interchange via the road to PEAU - DUNQUE Jct.... :o  :o  ;D  ;D  ;)  ;) I really like this arrangement a lot better... ;D  ;D  ;D I'll just change out std. gauge locomotives and rolling stock (since it's not LIVE track) from time to time, and it'll be very cool 8)  8)  8)  8)  8) .......  I think John Allen would have approved... ;)  ;) Next I positioned (mocked up) more track in some strategic locations like the long bridge through HARRISON and a little bit around one of the inclines.... ;D  ;D  ;)  ;) ....this helps keep me on track.... ;)

....Here's how it came out...............the rock formations with the pine trees aren't going to be located where they're pictured in these shots... ;D  ;D  ;D ........
006.JPG
003.JPG

the red arrow denotes the end of the trackage to the I ME MINE.......... ;)
007.JPG

this is where the 'long bridge' will go.... ;D  ;D
004.JPG
And here's the revised track plan or "FIELD ASSEMBLY INSTRUCTIONS".. :o  ;D  ;D  ;D  ;D  ;D  ;D  ;)
Orange is D&RGW, Black is IMMR & T Co. main line, Blue is IMMR & T Co. spurs, Yellow is IMMR & T Co. yard tracks, Green is the Std. Gauge trackage.......... ;D  ;D  ;D  ;D
017.JPG

I hope it makes some sense.. :o  :o ...I know I was "mucho plenty - heap big" tired when I finished...... :o  :o  ::)  ;) .....that's about all for now, thanx again for keepin' tabs on the project; ;)  ;)  ;) it's much appreciated as are always the comments, suggestions, critiques, raspberries, farts, belches and all manner of FUN COMMUNICATION  :(  :o  :o  :o  ::)  ::)  ::)  ;D  ;D  ;)...." Baby let your mind roll on".......(The Rooftop Singers, 1963)... ;D  ;D  ;D  ;D  ;D..............see ya......... 8)  8)  8)  8)  8)  8)  8) ........

KYLE CREEL
IMMR &T Co.     




Powered by EzPortal