Building a Kitwood Hill Models 45ft Gallows Turntable

Started by elwoodblues, July 22, 2026, 09:16:34 PM

Previous topic - Next topic

elwoodblues

Quote from: Philip on July 26, 2026, 10:11:19 PMOh Fun! Looking good~

Mine had an older N 20 type motor.
Thanks Philip,

From what I can gather I believe the supplied motor has changed over the years.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Rick on July 27, 2026, 06:09:22 AMRon, you're flying on this build.
Great color on those ties.
Thanks Rick,

I'm having a ton of fun building this and with 3 day weekends, it gives me lots of time to model.  Glad you like the colour on the ties.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: PRR Modeler on July 27, 2026, 06:54:24 AMWow Ron. You are smoking through this build. Everything looks very professionally done.
Thanks Curt,

Building this has been a blast.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Larry C on July 27, 2026, 07:43:52 AMRon great work and attention to detail!! Looks like a winner to me.
Thanks Larry,

It's has been an easy build so far as the engineering is spot on with very little fitting or sanding required.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Jerry on July 27, 2026, 11:25:35 AMGod there must be a loco on the the other side waiting to get out of the terminal.
At the rate your going he won't have to wait long!!!

Excellent build Ron.

Jerry
Thanks Jerry,

The crew is working overtime to get this done as the yard crew almost lost one locomotive into the void forgetting that the original turntable went missing, the cause of which is still under investigation.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

friscomike

Howdy Ron,

The turntable is progressing well.  Thank you for taking the time to document the process.  It is outstanding.

Have fun,
mike

elwoodblues

Quote from: friscomike on July 28, 2026, 11:05:57 AMHowdy Ron,

The turntable is progressing well.  Thank you for taking the time to document the process.  It is outstanding.

Have fun,
mike
Thanks Mike,

Glad you are enjoying the process.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Well my week at work is done and I have now time to get back to the turntable build. ;D  So without further ado, lets get to it.

I think from this point forward I'll show each step as I complete them instead of saving two or three steps and then posting them.  The reason for this is that I can post while I let the stain dry for the next step.

Part 8 - Bridge Support Wheel Assemblies


KHM-GT-055.jpg

First step is to stain the parts.  Shown here is the wheel support (at top) and the pieces required to build one wheel housing.



KHM-GT-056.jpg

The sides and end of the wheel housing glued to the wheel support.



KHM-GT-057.jpg

The wheel and axle installed in the wheel housing.



KHM-GT-058.jpg

The axle capture plates installed.  These are a very snug fit so that the axle stays in place.



KHM-GT-059.jpg

One completed wheel assembly.



KHM-GT-060.jpg

The above steps were completed to complete the second wheel support assembly.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

KHM-GT-061.jpg

The bridge support wheel assemblies attached to the bridge.

On to the next step. . . . . .
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca



elwoodblues

Thanks Philip and Rick,

This is turning out to be a fun easy build.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

PRR Modeler

Very nice although the wheel assembly looks very fiddly.
Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

elwoodblues

Quote from: PRR Modeler on July 31, 2026, 07:12:30 AMVery nice although the wheel assembly looks very fiddly.
Thanks Curt, actually the wheel assembly went surprisingly well, everything fit precisely.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Part 9 - Adding the Bridge Stringers

The instructions call for the stringers to be glued in place using one of the stay wires as a spacer, then turn everything upside down and weigh it down to keep it flat and square.  I figured this would be frustrating and complicated to keep square so I took a more measured approach.



KHM-GT-062.jpg

I started by gluing the outer stringers to the outside of the bridge.  I clamped them in place making sure that the outside stringers were flush with the edge of the bridge.



KHM-GT-063.jpg

I used some scrap wood and clamps to the center section of the bridge to make sure that the stringers were flush with the bridge deck.  This insures that the bridge will be flat when the glue dries.



KHM-GT-064.jpg

The outer stringers glued to the deck.



KHM-GT-065.jpg

I measured the diameter of the stay wires that were supplied with the kit.  The diameter of the stay wires were 0.032 diameter.  Rather than use the stay wire as the spacer, I didn't have any .030 styrene that was suitable so I cut some 0.010 and 1.020 sheet styrene in strips to use as spacers.



KHM-GT-066.jpg

I then clamped the inside stringers to the outside stringers using the spacers.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Powered by EzPortal