Building a Kitwood Hill Models 45ft Gallows Turntable

Started by elwoodblues, July 22, 2026, 09:16:34 PM

Previous topic - Next topic

elwoodblues

KHM-GT-067.jpg

I then turned the bridge upside down on the work bench and added weight to insure that the deck would stay flat while the glue dried.



KHM-GT-068.jpg

Once everything was dried, the spacers were removed.



KHM-GT-069.jpg

The last part of this assembly sequence was to to glue the upper spider to the underside of the bridge.

That's it for now.

Thanks for looking in.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

elwoodblues

Quote from: PRR Modeler on July 31, 2026, 12:49:39 PMThat seems very complicated to me Ron.
Curt, it seems complicated but the instructions have a lot of great photos that show the process.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

deemery

A turntable is inherently a complex structure with some tight tolerances.  I don't think I've ever built a better designed kit than this one.  Everything went together perfectly and the result works really well.  The instructions are first rate (and when I had a question, it was answered quickly.)  

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Rick

Ron, it's coming together nicely and thanks for all the pictures.

elwoodblues

Quote from: deemery on July 31, 2026, 02:16:02 PMA turntable is inherently a complex structure with some tight tolerances.  I don't think I've ever built a better designed kit than this one.  Everything went together perfectly and the result works really well.  The instructions are first rate (and when I had a question, it was answered quickly.) 

dave
Dave, I agree with you on the quality of the instructions.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Rick on July 31, 2026, 02:31:47 PMRon, it's coming together nicely and thanks for all the pictures.
Thanks Rick,

I figure if someone else wanted to build this kit the step by step would help. 
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Part 10 - Fitting the rails.

Next up is attaching the rails.  The instructions call for using a piece of flex track with most of the ties stripped off.  Seeing as my layout is 95% hand laid, there was no other option was to hand lay the rails.  ;D  If my calculations are correct, I'll have 95.1% hand laid track when I'm done.



KHM-GT-070.jpg

First up was soldering the leads to the bottom of the rail.



KHM-GT-071.jpg

Here is where things get interesting.  The instructions say that there are 2 centering gauges that are in with the gear bag.  Unfortunately the kit didn't come with the gear bag so there was no centering gauge.  :o



KHM-GT-072.jpg

So, in order to center the rail I did what I always I made a jig.  ;D



KHM-GT-073.jpg

The rails spiked to the bridge.



KHM-GT-074.jpg

The rails trimmed to size.



KHM-GT-075.jpg

The last step is to file the inside if the rail.  This is to allow for easy alignment when it use.

Thanks for looking in.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Larry C

Ron excellent work; it doesn't get any better than that. Should work
flawlessly.
Current Projects: O'Neils Mercantile & Repair
                           
http://www.ussvigilant.blogspot.com

deemery

As an example of how well-designed this kit is:  Look at the instruction photos showing the track gauge templates.  There's a center hole that matches the hole in the bridge, and a pin that makes sure the gauge is properly centered.  The gauge has 2 widths.  One is for HO/On30, and the other is for On3, depending on how you orient the gauge.  It's too bad those parts weren't in Ron's box.  

dave
Modeling the Northeast in the 1890s - because the little voices told me to

PRR Modeler

Outstanding modeling Ron. What are the rail spikes made from?
Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision


elwoodblues

Quote from: Larry C on July 31, 2026, 06:10:43 PMRon excellent work; it doesn't get any better than that. Should work
flawlessly.
Thanks Larry,

The plan is to have it work flawlessly.  ;D
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: PRR Modeler on July 31, 2026, 06:47:26 PMOutstanding modeling Ron. What are the rail spikes made from?
Thanks Curt,

The spikes are Micro-Engineering small spikes (part #30-106)
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Powered by EzPortal