Building a Kitwood Hill Models 45ft Gallows Turntable

Started by elwoodblues, July 22, 2026, 09:16:34 PM

Previous topic - Next topic

elwoodblues

Quote from: Zephyrus52246 on August 09, 2026, 11:31:23 AMThat's a great looking turntable, Ron.  I don't envy you dealing with the NBWs.

Jeff
Thanks Jeff, I really didn't want to spend 4 frustrating hours making the NBW's so I took the easy way out.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: PRR Modeler on August 09, 2026, 12:39:02 PMRon you did a great job with the NBW's. You were smart using the Tichy product. Every additional step makes the TT more awesome.
Thanks Curt, I'm really glad I used the Tichy NBW's.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Jerry on August 09, 2026, 03:00:32 PMRon that is outstanding!
Now that you got those little NBW's done sit down have a double scotch and call it a day!!  ;D

Jerry
Thanks Jerry, I think I'll take up our offer and have that double scotch.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Time for another Update,

Part 14 - Installing the deck.

KHM-GT-098.jpg

Staining the deck, I decided to stain the deck with Hunterlines's Driftwood Stain.  First coat went on well but I felt it was a little light so I added a second coat.  Not thinking I dipped the brush in the Tie Brown, you can see the difference on the right hand side of the decking.  The rest of the deck got the driftwood stain.  I'm counting this as a "happy" mistake.



KHM-GT-099.jpg



Splitting the deck.

KHM-GT-100.jpg

I glued down the center section first.  I used my most super sophisticated clamps at the end to hold the decking in place.



KHM-GT-101.jpg

I noticed the middle bowed up a little so I added additional weight to take the bow out of the deck.



KHM-GT-102.jpg

The center deck dried and ready to go.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

KHM-GT-103.jpg

Next up is the installation of the end panels.  Rather that add glue to the individual ties I added a thin layer to the underside of the decking to glue them to the bridge.



KHM-GT-104.jpg

Both sides of the decking glued to the deck with my super duper clamps holding in in place.  I also added the 1-2-3 blocks in the decking to keep everything flat while the glue dried.



KHM-GT-105.jpg

The decking installed and ready to go.



KHM-GT-106.jpg

Another view of the decking.

The end is in site, according to the instructions, there is only one step left.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Larry C

Ron that looks amazing!!!! The "accident" adds a nice touch of unintentional weathering.
Current Projects: O'Neils Mercantile & Repair
                           
http://www.ussvigilant.blogspot.com

PRR Modeler

Very nice Ron. Sometimes little accidents give us the best results
Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

deemery

Quote from: PRR Modeler on August 09, 2026, 05:12:17 PMVery nice Ron. Sometimes little accidents give us the best results
"we don't make mistakes.  we have happy little accidents."

dave
Modeling the Northeast in the 1890s - because the little voices told me to

robert goslin

Nice work Ron.  Sometimes happy little accidents are meant to happen.  Good to have some variation in the wood colour, even if you didn't plan it that way.
Should be a stunning turntable when finished.  The NBW's are a nice touch, that are not always modelled.
Great looking rigging too.
Regards  Rob
Melbourne,  Australia
Borrow money from pessimists – they don't expect it back

Powered by EzPortal