The HARRISON & PEAU~DUNQUE RAILWAY

Started by kyle creel, October 14, 2026, 04:19:15 PM

Previous topic - Next topic

kyle creel

Howdy fellas ;D  ;D ....Thanx LarryC*., and thanx to all the ones that just stopped by for a quick glance... ;D  ;D ....

Nice start indeed....I started the whloe thing off backwards :o  :o  :o yes backwards >:(  >:(  >:(  >:( the orentation in the room is opposite how I need it to be, and to make things a little more convoluted :o  :o in this orentation there's 2 turnouts I won't be able to reach without a step stool :o  >:( ...and I ain't using a step stool to switch a couple of turnouts at 73....I'd probably slip and fall.... >:(  >:(  >:(  >:(  ;D  ;D  ;D  ;D  ;D

So I did the only thing possible.... I "reoriented" the thing.... :o  :o (flipped it over) and went on about the business of laying track......I'm almost done...... ;D  ;D  ;) ...of course this changed the town layout in HARRISON...but I actually think I like it better the way it's turned out, I also gained a spot for the 2-6-2T engine shed in Harrison, instead of having it over in, or near PEAU-DUNQUE Jct.... ;D  ;D  ;D  ;D  ;D  I've got about 8-10 more feet of track to lay; the main line is all done except for the curve in HARRISON where the whisker tracks to the sector plate connect, the 4' curved section of 2% grade up to the mine, and the reversing section that cuts across the 'oval'; all the cork road bed is laid, so all that's left is to glue down the track ... :o  :o  :o.......Doctors appts and other 1:1  stuff kept getting in the way; so I'll hope to have all the track work done by the end of this up coming weekend.... ;D  ;D  ;D ...

Here's what I've done.........

Starting with HARRISON.........
001.JPG
003.JPG

Future site of PEAU-DUNQUE Jct............(old hand laid rail)
004.JPG

The backside curve around the KAMPHUES' CUT location....(Kamphues is my best friends Marks' last name)
005.JPG

The 'cut off' / reversing section...............
006.JPG

...and the whisker track connections.................
007.JPG

That's it for now; the next post will have a couple of shots of 'downtown Harrison'.....thanx again for all the support and suggestions and ya'll come back now.......see ya.............. 8) 8)  8)  8)  8)  8)  8)

KYLE CREEL
HPD Ry.

kyle creel

OK here's Harrison.................
008.JPG
009.JPG

It ain't much to look at now, but I think the possibilities are there........

Thanx again............see ya.......... 8)  8)  8)  8)

KYLE CREEL
HPD Ry.

Larry C

Kyle great start!! Nice you were about to switch things around a bit
and the fact you like it better is a happy accident for sure. Don't blame
you for NOT wanting to use a step stool; not a good idea when you're getting
up in years. Have fun.
Current Projects: Pratt's Cove
                           
http://www.ussvigilant.blogspot.com

friscomike

Howdy Kyle,

The restart is looking good.  Good luck at the doctors.

Have fun,
mike

kyle creel

#19
Thanx Larry C*., thanx Mike, ya'll are too kind...and a big ol' thanx to all the ones that ventured by for a quick glance at the project... ;)  ;) it's most appreciated....

All of the main line track is in.  :o  ;D  ;) ...I still have some track work to do on the mine branch, and the approaches to the sector plate... ;D...the little white 'balls' on the track aren't styrofoam 'doo-doo' they're the ends of the straight pins I used to secure the track while the "Tacky Glue" set up....I also carved out the pink foam area for the sector plate 'pit', although I only went deep enough to check allignment and clearance. ;) ..The actual depth will be about the same as with the old sector plate on the previous project... ;D .. I'm going to try and 're-use' the 'pit floor' so I hope it comes out of the old foam in one piece....I have more material for a new one, but why go to all that trouble if the old one can be salvaged, and cut down to fit the new size ;D  ;D ....the old one is 15-1/2" across the bridge, and the new one only needs to be 12"-13" across the bridge; besides, I've already cut down the bridge to fit...so salvaging the old 'pit floor' will be a  project for tomorrow (Wednesday)......here's some shots of the progress........thanx for the interest....... ;D  ;D  ;D

The 'pit'...I'll 'sand' it down to the proper depth and get it smoothe and level after the 'pit floor salvage
002.JPG
003.JPG
005.JPG


Location of the depot................
011.JPG


Depot, engine shed for the 2-6-2T, and the team track...........
012.JPG



Possible std. gauge interchange here in PEAU-DUNQUE Jct.  ............
006.JPG



That's it for now......thanx again for stoppin' by and ya'll stay tuned,... have a great day.....and......
see ya..... 8)  8)  8)  8)

KYLE CREEL
HPD Ry.

Larry C

Kyle looks like you're making some great progress. I'm with you on salvaging the pit floor if it's possible. Keep up the good work and have fun.
Current Projects: Pratt's Cove
                           
http://www.ussvigilant.blogspot.com

deemery

On your standard/narrow interchange:  If you think about the actual mechanics of moving stuff, AND the respective heights of std gauge vs narrow gauge cars, you'd want that standard gauge track to be a foot or two lower than the narrow gauge, so the top of 2 flat cars (best example would be level.)  I don't know if you can do that easily on the layout, but it's something to think about.

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Philip


Powered by EzPortal