Inter-Action Enterprises Seabiscuits Boatworks

Started by madharry, August 23, 2020, 05:45:47 AM

Previous topic - Next topic

madharry

Thanks very much Karl and Greg. It is a great kit!
Mike :)

Michael

Hi Harry
I am finding your build blog very helpful, thanks
Can anyone give me some help on the position of part 37, the larger arch door way, attached to the front bay wall. It says 1 inch below the peak of the front bay wall but the diagram shows a line above the top of the front bay wall. Not sure what is intended. Is 1 inch below the top of the front bay.
Michael in Queensland Australia

GPdemayo

You're welcome Mike.....and have a Merry "First" Christmas in the new house.  :) :) :)
Gregory P. DeMayo
General Construction Superintendent Emeritus
St. Louis & Denver Railroad
Longwood, FL

Rail and Tie

Quote from: Michael on December 22, 2021, 02:28:21 AM
Hi Harry
I am finding your build blog very helpful, thanks
Can anyone give me some help on the position of part 37, the larger arch door way, attached to the front bay wall. It says 1 inch below the peak of the front bay wall but the diagram shows a line above the top of the front bay wall. Not sure what is intended. Is 1 inch below the top of the front bay.
Michael in Queensland Australia


Hi Michael, the attached drawing should help clarify your question.  Looking forward to your Build


Darryl
Interaction Hobbies
Darryl Jacobs
Inter-Action Hobbies
www.interactionhobbies.com

postalkarl


Powered by EzPortal