Workman's and Son by CCK

Started by Raymo, November 19, 2014, 06:26:46 PM

Previous topic - Next topic

Raymo

When the shingles were all attached,I dry brushed light grey and grimy black on the shingles and applied the painted piece of the envelope to the peak

Raymo

After that dried,I attached the other chimney to the backside of the roof. I also lifted some shingles and gave the whole thing an A&I wash. When that set up I drybrushed some of the Sea Glass over the flashing.

Raymo

That's it for this installment. Next up stairs and loading docks. Raymo

Powered by EzPortal