Mclachlan Hat factory

Started by fsmcollector67, December 08, 2016, 10:18:05 AM

Previous topic - Next topic

S&S RR

Loren


Great looking build - that's a lot of windows. I can see why it was 6 months.  You need to pick a brick building with no windows on the sides for your next build.
John Siekirk
Superior & Seattle Railroad

fsmcollector67

#211
Tommy,
Thanks for the comment...the windows are 8217 6/6. The brick material is combination of three vendors. The building pieces are Monster Model works aged brick, the lower portion under the smoke stack is New England Brownstone hydrocal brick, and the top little section is CC crow leftovers. I wish I could get a feature in a railroad magazine....If anyone out there has any contacts, this will be on display next week at the ****Danbury Museum   43 Main St Danbury, Ct.****** Thanks again for the great comment..
Loren...
9 Fingers Loren.....
"Watch out for that #11 Blade"

fsmcollector67

John,
You are so right, in fact I started an FOS kit yesterday (First kit that I will have ever built). It has 6 windows......That will be showing up in the kit building forum soon...
Thanks for the great comment....
Loren...
9 Fingers Loren.....
"Watch out for that #11 Blade"

GPdemayo

Terrific structure and absolutely wonderful scene.....great work Loren.  8)
Gregory P. DeMayo
General Construction Superintendent Emeritus
St. Louis & Denver Railroad
Longwood, FL

fsmcollector67

Greg,
Thanks for the comment...
Loren...
9 Fingers Loren.....
"Watch out for that #11 Blade"

Powered by EzPortal