Mauston Wisconsin station

Started by ak-milw, October 21, 2016, 07:38:40 PM

Previous topic - Next topic

ak-milw

Will be bracing walls for the next few days.

postalkarl

Hi andy:

looks like you are off to a good start. Keep the photos coming as I will be following along.

Karl

ACL1504

"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ak-milw

I sure will guy's, one tomorrow.

ak-milw

I have the walls all braced.



next to paint the inside and add the brick sheet.

ak-milw

I painted the inside black and gave the brick sheet a coat of paint, it helps keep the bricks from falling off when cutting. Next step will be to get the brick on the walls. Sorry no picture, I didn't think it was exciting enough.

ak-milw

I painted the brick sheet white and stuck it on the wall sections.



now to recut the openings.

ak-milw


ak-milw

I assembled the four wall sections, next is the bump out.


Twopoint2

Andy

The build is looking great ill be watching.

ak-milw

Quote from: Twopoint2 on November 20, 2016, 12:23:03 PM
Andy

The build is looking great ill be watching.

Thanks Jim, and thanks for stopping by.

Bump out all built.


postalkarl

Hi Andy:

Looks great so far.

Karl

ak-milw

Quote from: postalkarl on November 25, 2016, 07:44:19 AM
Hi Andy:

Looks great so far.

Karl

Thanks Karl, I am working on the fancy brick work now.

ak-milw

All the window and door headers and sills are on, also gave it another shot of paint. now to paint the inside of the bump out and then windows and doors.


ak-milw

Put in all the doors and windows. Now to get the glass in and then glue the bump out on.


Powered by EzPortal