Superior & Seattle Railroad Build (Volume 3) Started 7/27/19

Started by S&S RR, July 27, 2019, 08:44:50 PM

Previous topic - Next topic

S&S RR

Tonight, some progress photographs of the Brownsville Depot build. The bay window has been added along with lots of trim.












The roof over the front dock is about to go on - the glue for the structural beams is drying in the foreground of this picture.
John Siekirk
Superior & Seattle Railroad

S&S RR

Progress has also been made on the Sayles Mill build.  The window casting are going in and the tile roof is being added. The rafter tails and trim were also added, along with the clerestory and roof, since the last photographs were taken.

















John Siekirk
Superior & Seattle Railroad

S&S RR

This evening I noticed that this thread has hit the 190 page mark.  It has been recommended by the administrator that we close a thread before reaching the 200 page mark.  So tonight I'm locking this Superior & Seattle Railroad  (Volume 3) build thread and starting Volume 4. Below is a link to Volume 4.



Link to Volume 4:




http://modelersforum.com/index.php?topic=5946.msg163471;topicseen#new
John Siekirk
Superior & Seattle Railroad

S&S RR

John Siekirk
Superior & Seattle Railroad

Powered by EzPortal