Hank's Machine Shop

Started by Larry C, October 15, 2025, 06:00:58 PM

Previous topic - Next topic

Larry C

Rick thank you.

Gary thank you so much.

Philip thanks. The 3D LP prints are from Rusty Rail and they are reasonably priced; I ordered 4 more to include in and around the Shop.

Dave thank you. That would be a novel idea.

Rich thanks; I've enjoying building this one.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

Philip


Larry C

Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

Larry C

Moving along:

IMG_M0068.jpg

Now that I've constructed the other 3 rafters, using my template, it's time to install then on the Shop. I wanted to make sure all the peaks were lined up so I grabbed a length of 2x10 and attached it  to the end rafters using straight pins to make sure everything lined up instead of just "eye balling" it.

IMG_M0069.jpg

All the rafters have been glued in place and the distance between each one is pretty much spaced evenly and plumb with the top beams.

IMG_M0070.jpg

Here's an end view and as you can see they are all lined up perfectly which should adding the subroof much easier; that of course is my next step. As always thanks for stopping by and for all your great comments and/or suggestions; they are very much appreciated.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

friscomike

Howdy Larry,

The LPs add an even more character to the shop.  It seems a shame to cover up those fine details with a roof, but it does look good. Nice work.

Have fun,
mike

Larry C

Mike thanks. By the time I get done with the Shop you'll be able to see all those details just fine.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

Larry C

Curt thank you. Roofs are my least favorite build job; but sometimes it needs to be done.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

Jerry

Larry the rafters look great nice job.

And the pins add a nice detail!!   :) ;D

Jerry
"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

Philip


Rick

Rafters look good.
Will you be adding lights?

Pennman

Larry,

Great idea on how to match up the roof rafters.
I do the same with checking using a piece of stripwood, but never
thought of pinning it in place, good work.

Rich

Larry C

Jerry, Philip, Rick, and Rich thank you guys so much for your support and your comments. Yes I will be adding lights to this one so all those details are visible.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

Larry C

This will most likely be my last update until after Christmas:

IMG_M0071.jpg

The sub roof is finished. Used 2x10's for a little more support; decided against using card stock and went with the wood instead. I did color the underside of the wood just in case it shows when I get the lights installed; if not I know it was done.

IMG_M0072.jpg

Here is the finished front side of the roof. Used 1x10's for the roof which were grained, colored with chalk and clear alcohol then a liberal coat of A&I was added while the wood was still wet. The seams are covered with 1x4's given the same treatment. All in all I think this turned out quite nicely.

IMG_M0073.jpg

This is with the Shop sitting on a half inch base. Next will be to install the lighting up in the rafters BEFORE I start on the back part of the roof. When the roof is done then I'll add the ridge cap to both sides and add some weathering as well. Thanks for stopping by and for all your great comments and/or suggestions; they really do help.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

kyle creel

Just getting caught up Larry C*.

This looks amazing. I just can't get over it....it's almost as if I'm looking at a structure in a miniature world.  I see what you've created, and then start to study the ones you sent me, and I get amazed all over again  ;D  ;D .....fascinating...... 8)  8)  8)
MERRY CHRISTMAS.......

KYLE CREEL
G&D Ry Co.

Powered by EzPortal