Building a Kitwood Hill Models 45ft Gallows Turntable

Started by elwoodblues, July 22, 2026, 09:16:34 PM

Previous topic - Next topic

elwoodblues

KHM-GT-067.jpg

I then turned the bridge upside down on the work bench and added weight to insure that the deck would stay flat while the glue dried.



KHM-GT-068.jpg

Once everything was dried, the spacers were removed.



KHM-GT-069.jpg

The last part of this assembly sequence was to to glue the upper spider to the underside of the bridge.

That's it for now.

Thanks for looking in.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

elwoodblues

Quote from: PRR Modeler on Today at 12:49:39 PMThat seems very complicated to me Ron.
Curt, it seems complicated but the instructions have a lot of great photos that show the process.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

deemery

A turntable is inherently a complex structure with some tight tolerances.  I don't think I've ever built a better designed kit than this one.  Everything went together perfectly and the result works really well.  The instructions are first rate (and when I had a question, it was answered quickly.)  

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Rick

Ron, it's coming together nicely and thanks for all the pictures.

elwoodblues

Quote from: deemery on Today at 02:16:02 PMA turntable is inherently a complex structure with some tight tolerances.  I don't think I've ever built a better designed kit than this one.  Everything went together perfectly and the result works really well.  The instructions are first rate (and when I had a question, it was answered quickly.) 

dave
Dave, I agree with you on the quality of the instructions.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Rick on Today at 02:31:47 PMRon, it's coming together nicely and thanks for all the pictures.
Thanks Rick,

I figure if someone else wanted to build this kit the step by step would help. 
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Powered by EzPortal