The HARRISON & PEAU~DUNQUE RAILWAY

Started by kyle creel, October 14, 2026, 04:19:15 PM

Previous topic - Next topic

kyle creel

Howdy fellas ;D  ;D ....Thanx LarryC*., and thanx to all the ones that just stopped by for a quick glance... ;D  ;D ....

Nice start indeed....I started the whloe thing off backwards :o  :o  :o yes backwards >:(  >:(  >:(  >:( the orentation in the room is opposite how I need it to be, and to make things a little more convoluted :o  :o in this orentation there's 2 turnouts I won't be able to reach without a step stool :o  >:( ...and I ain't using a step stool to switch a couple of turnouts at 73....I'd probably slip and fall.... >:(  >:(  >:(  >:(  ;D  ;D  ;D  ;D  ;D

So I did the only thing possible.... I "reoriented" the thing.... :o  :o (flipped it over) and went on about the business of laying track......I'm almost done...... ;D  ;D  ;) ...of course this changed the town layout in HARRISON...but I actually think I like it better the way it's turned out, I also gained a spot for the 2-6-2T engine shed in Harrison, instead of having it over in, or near PEAU-DUNQUE Jct.... ;D  ;D  ;D  ;D  ;D  I've got about 8-10 more feet of track to lay; the main line is all done except for the curve in HARRISON where the whisker tracks to the sector plate connect, the 4' curved section of 2% grade up to the mine, and the reversing section that cuts across the 'oval'; all the cork road bed is laid, so all that's left is to glue down the track ... :o  :o  :o.......Doctors appts and other 1:1  stuff kept getting in the way; so I'll hope to have all the track work done by the end of this up coming weekend.... ;D  ;D  ;D ...

Here's what I've done.........

Starting with HARRISON.........
001.JPG
003.JPG

Future site of PEAU-DUNQUE Jct............(old hand laid rail)
004.JPG

The backside curve around the KAMPHUES' CUT location....(Kamphues is my best friends Marks' last name)
005.JPG

The 'cut off' / reversing section...............
006.JPG

...and the whisker track connections.................
007.JPG

That's it for now; the next post will have a couple of shots of 'downtown Harrison'.....thanx again for all the support and suggestions and ya'll come back now.......see ya.............. 8) 8)  8)  8)  8)  8)  8)

KYLE CREEL
HPD Ry.

kyle creel

OK here's Harrison.................
008.JPG
009.JPG

It ain't much to look at now, but I think the possibilities are there........

Thanx again............see ya.......... 8)  8)  8)  8)

KYLE CREEL
HPD Ry.

Larry C

Kyle great start!! Nice you were about to switch things around a bit
and the fact you like it better is a happy accident for sure. Don't blame
you for NOT wanting to use a step stool; not a good idea when you're getting
up in years. Have fun.
Current Projects: Pratt's Cove
                           
http://www.ussvigilant.blogspot.com

friscomike

Howdy Kyle,

The restart is looking good.  Good luck at the doctors.

Have fun,
mike

kyle creel

#19
Thanx Larry C*., thanx Mike, ya'll are too kind...and a big ol' thanx to all the ones that ventured by for a quick glance at the project... ;)  ;) it's most appreciated....

All of the main line track is in.  :o  ;D  ;) ...I still have some track work to do on the mine branch, and the approaches to the sector plate... ;D...the little white 'balls' on the track aren't styrofoam 'doo-doo' they're the ends of the straight pins I used to secure the track while the "Tacky Glue" set up....I also carved out the pink foam area for the sector plate 'pit', although I only went deep enough to check allignment and clearance. ;) ..The actual depth will be about the same as with the old sector plate on the previous project... ;D .. I'm going to try and 're-use' the 'pit floor' so I hope it comes out of the old foam in one piece....I have more material for a new one, but why go to all that trouble if the old one can be salvaged, and cut down to fit the new size ;D  ;D ....the old one is 15-1/2" across the bridge, and the new one only needs to be 12"-13" across the bridge; besides, I've already cut down the bridge to fit...so salvaging the old 'pit floor' will be a  project for tomorrow (Wednesday)......here's some shots of the progress........thanx for the interest....... ;D  ;D  ;D

The 'pit'...I'll 'sand' it down to the proper depth and get it smoothe and level after the 'pit floor salvage
002.JPG
003.JPG
005.JPG


Location of the depot................
011.JPG


Depot, engine shed for the 2-6-2T, and the team track...........
012.JPG



Possible std. gauge interchange here in PEAU-DUNQUE Jct.  ............
006.JPG



That's it for now......thanx again for stoppin' by and ya'll stay tuned,... have a great day.....and......
see ya..... 8)  8)  8)  8)

KYLE CREEL
HPD Ry.

Larry C

Kyle looks like you're making some great progress. I'm with you on salvaging the pit floor if it's possible. Keep up the good work and have fun.
Current Projects: Pratt's Cove
                           
http://www.ussvigilant.blogspot.com

deemery

On your standard/narrow interchange:  If you think about the actual mechanics of moving stuff, AND the respective heights of std gauge vs narrow gauge cars, you'd want that standard gauge track to be a foot or two lower than the narrow gauge, so the top of 2 flat cars (best example would be level.)  I don't know if you can do that easily on the layout, but it's something to think about.

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Philip


kyle creel

#23
Thanx guys; Larry C*., Dave, and Phillip, along with everybody that likes a little glimpse of the HPD Ry... ;D  ;D  ;D  ;D ...

Larry, I was able to salvage the 'pit floor' from the old benchwork;  >:(  >:( man, that liquid nails is hard to get off of a surface....I used my sharpest knife at about a 30 degree angle and scraped it off 'sawing back n' forth'...'what a bitch she was' >:(  >:(  ;D  ;D  ;D  ;D ....I cut it down to fit, put it in place, and began sanding down the pink foam foundation so it's low enough that the bridge tracks are level and even at the rail head tops of the approach / whisker track(s) ;D  ;D  ;D  ;D

Dave, I like the idea,  ;)  ;) and have been mulling it over in my noggin..more to come...

Phillip, yup we're off and running; now if I can only keep it on the rails... :o  :o

Next up (tomorrow or the next day) Thursday / Friday, I'll double check everything and glue it in place.......I'll pick my most 'persnickety' piece of rolling stock and let it roll freely across the joints between the approach/whisker tracks and the sector plate bridge track......see if it works.... ::)  ::)  ;D

OK let's have a look; here we go :o  :o  ;D  ;D  ;D  ;D  ;D .......the sector plate project so far....
002.JPG
003.JPG
004.JPG
008.JPG

....and here's the next area to get from its' current condition .. its' rough form, into semi finished, and ready for the next step..........
005.JPG
The above shot shows the hand laid track on the main line glued in place; and the Atlas curved sectional track on the curved grade...I'll start on the 4% grade track (which is all that's not glued in place) by getting the track connectors installed, and then get it glued in place..... after that it's time to paint and weather the Atlas track to match the hand laid track... ;D  ;D  ;D ...by my calculations, including ALL track work (sidings, grades, and whisker tracks) the breakdown is appx 46% hand laid, 54% Atlas, Kato and Peco ;D  ;D  ;D ... I could've done it up 90% hand laid, but that would've required me to not have the security of the Atlas curved sectional track where I would've most needed it to insure smoothe curves in some locations......like the grade and the reversing section.....

;D  ;D  ;D  ;)  ;)....that's about it from the old HPD Ry.  ;D  ;D Thanx again for all the comments and suggestions...they help so much and always get me to think first, then what to do next...and how to do it :o  ;D  ;) .... as always ............see ya........... 8)  8)  8)  8)  8) ....

KYLE CREEL
HPD Ry.

Larry C

Kyle great progress!! The sector plate base looks good. Don't blame you for using Atlas track on that curve;
I done enough handled track to know doing a curve like that is a "bear" and not always as reliable as you'd like. Keep at it and have fun.
Current Projects: Pratt's Cove
                           
http://www.ussvigilant.blogspot.com

Jerry

Nice progress keep up the good work!

Jerry
"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

Powered by EzPortal