2025-2026 Winter Challenge - AMB Interlocking Tower

Started by ACL1504, January 23, 2026, 04:38:06 PM

Previous topic - Next topic

deemery

Modeling the Northeast in the 1890s - because the little voices told me to

ACL1504

Quote from: deemery on February 06, 2026, 06:51:33 PMOh, someone over at MRH forums recognized my roll-top desk as an Interactive kit:  https://www.interactionhobbies.com/HO-Scale-Kit-Roll-Top-Desk-and-Chair_p_39.html

dave


Dave,

I did recognize the as an Interactive desk. I have one but not built.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

Mark Dalrymple

Thanks for the follow up photos, Tom.  Some great shots there.

My mistake - I thought the roof piece was a pyramid with a flat bottom.  I went back to the start of your thread and relooked at the photos.  There is a slight problem with thickness, with the material provided in the kit probably being a scale 5 1/2" thick, while the prototype looks to be 1" plus roofing material - but I don't think you would notice.  I quite like the idea of rafters with a 3x2" running along underneath.  Something quite different that I haven't seen before.

Cheers, Mark.

ACL1504

Quote from: PRR Modeler on February 06, 2026, 06:13:09 PMVery nice Tom. Obviously the stove is in the lower level! ;)
Butty Curt,

Thank  you and yes, I guess it is.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ACL1504

Quote from: Mark Dalrymple on February 07, 2026, 03:27:47 PMThanks for the follow up photos, Tom.  Some great shots there.

My mistake - I thought the roof piece was a pyramid with a flat bottom.  I went back to the start of your thread and relooked at the photos.  There is a slight problem with thickness, with the material provided in the kit probably being a scale 5 1/2" thick, while the prototype looks to be 1" plus roofing material - but I don't think you would notice.  I quite like the idea of rafters with a 3x2" running along underneath.  Something quite different that I haven't seen before.

Cheers, Mark.

Mark, Cheers,

The thickness on the roof panels is 5 inches as you said. A bit thick for a model.

I'll let the roofing paper hang over a little and this should help disquise the thickness some.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

friscomike

Howdy Tom,

The tower is looking fantastic.  It's always fun to follow your builds.

Have fun,
mike
My current builds are a Post Office. and miscellaneous rolling stock

elwoodblues

Tom, more great progress as per your usual standards.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

ACL1504

Quote from: friscomike on February 08, 2026, 09:13:07 AMHowdy Tom,

The tower is looking fantastic.  It's always fun to follow your builds.

Have fun,
mike
Mike, Howdy,

Thank you very much. I do appreciate you following along on any of my threads.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ACL1504

Quote from: elwoodblues on February 08, 2026, 10:00:58 AMTom, more great progress as per your usual standards.
Ron,

Thank you my friend, much appreciate the compliment.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ACL1504

I added the kit stringers, steps and railing to the tower. After the glued dried, I did a little touch up of the white paint.



The kit has a door frame that fit around the upper door. The kit also has this door closed. I'm making my door open for another view of the inside of the tower and the interlocking levers.

With the door closed, the frame would fit properly. However, my door open so it was necessary to cut off the bottom portion of the frame.



"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ACL1504

This next photo shows the door frame in place.



I wasn't satisfied with not having a desk in the tower office area. For a desk to fit, I needed to removed the already glued levers.

I used a small bowl of warm water and using an eye dropper, added a few small drops of warm water to the area around the lever base.




"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ACL1504

After 10 to 15 minutes, the glue under the base was soft enough for me to pry up the base and clean the floor.





"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

ACL1504

I used some scrap lumber and made a new base.





The base was cut out of the sheet lumber, stained and glued under the levers.



Done for today.
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

deemery

It's always interesting to see "rework".  I think the result will be worth the hassle, there's a lot of window surface to let someone see into the tower.

dave
Modeling the Northeast in the 1890s - because the little voices told me to

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

Powered by EzPortal