Ogden & Cache Valley, Part II

Started by Onewolf, August 16, 2024, 10:37:32 AM

Previous topic - Next topic

Onewolf

Quote from: deemery on August 24, 2025, 10:39:52 AMAnd then I caulked and painted the homesote.

What did you use caulk for with the homasote?  Filling in joints? 

dave

Yes, I caulked the joints between pieces of Homasote.

Onewolf

Quote from: Jerry on August 24, 2025, 10:49:04 AMNice update.  Don't forget the cat's up there!!  ;D

Jerry

I debated whether to let her get down on her own or to stage a rescue intervention.  I opted for rescue intervention.

ACL1504

Doug,

Great to see you still working. It is fantastic and will be fun to watch the track installed.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

Onewolf

I am working on laying the lower level return loop/staging tracks. There will be 8 loops with the outside loop representing the UP mainline east of Ogden. Each loop will have a rerailer on each end. All of this track will eventually be hidden (either under the city of Ogden or behind the Ogden city backdrop.

The 7 staging tracks range from 250" to 296" in length.

I started working on the eastbound side and installed 3 turnouts but then I decided that I should focus first on the westbound side because I need all 7 of those turnouts in order to complete the outside (mainline) loop.

The 2nd photo is a closeup of the track gapping for the turnout ladders. Per this DCCWiki https://dccwiki.com/PECO_Insulfrog Peco insulfrog turnouts should have both point rails gapped to prevent shorts on the frog. On my previous layout I did not know this and I experienced intermittent shorts for this exact reason.

The point rails gapped at #2. The rerailers are double gapped (#1) on the right side to create an isolated occupancy zone (the whole loop). Repeat 14 times for each of the turnouts.

The Norfolk Western 50ft boxcar has been designated the sacrificial lamb for initial track testing.
 :P

Jerry

Doug this is sure to be a beautiful layout when your done.

Jerry
"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

Onewolf

#125
I finished installing the track for the lower return loop and I installed the track power bus 12ga wires for the 8 track loops and 2 turnout ladders. I installed the 22ga track feeder wires for the outside/mainline loop and the turnout ladders. I hooked up the track power bus to the power district circuit breaker. And I was able to run a locomotive the whole way around the outside loop. Still working on filling in the ties removed while installing/soldering the flex track pieces.

20250829_142633.jpg

A coil for each track power bus for occupancy detection (current going through a coil produces current which is detected by the occupancy detector boards.

20250830_155238.jpg

One track power bus for each loop (occupancy zone)

20250830_155406.jpg

Getting ready to solder track feeders along the turnout ladder.

20250831_155805.jpg

Jerry

"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

Rick

That's going to be an impressive yard.
Nice neat wiring too.

ACL1504

An 8 track reverse loop, love it Doug.

Tom
"If we are to guard against ignorance and remain free, it is the responsibility of every American to be informed."
Thomas Jefferson

Tom Langford
telsr1@aol.com

Onewolf

Quote from: ACL1504 on September 02, 2025, 07:43:14 PMAn 8 track reverse loop, love it Doug.

Tom

Previous layout had 6 track return loops, but since I have the space why not go larger?  :)  Upper return loop will probably have 7 loops.

Powered by EzPortal