The Grizzly & Dilapidated Ry.

Started by kyle creel, February 02, 2025, 10:19:09 PM

Previous topic - Next topic

kyle creel

#585
Thanx Larry C*., thanx Phillip, thanx Mike, thanx Michael,and thanx Curt,....and thanx to all who dropped by for a quick look-see..... ;D  ;D  ;D  ;) ....

I stopped the construction  :o  :o  :o  >:( ....

I realized the project had become too complex,  :o .. tracks in concentric circles with one of them (the inside one) hidden inside a mountain... >:(  >:(  >:( ....can't get to it....and just too much trackage in this amount of space.... >:(  >:(  :o  :o ....Tuesday night ...(not TUESDAY AFTERNOON... ;D  ;D  ;D  ;) ) ...I decided to sleep on it...and Wednesday morning I had an idea .. :o  ;D  ;D ....just do a simple figure 8 over and under , with access trackage from Grizzly, and an interchange with the D&RGW at Dilapidated; and put Po-Dunk Jct. under the arch bridge where the access tracks to Grizzly are... ;D  ;D  ;D  ;D  ;D  ;)  ;) ......simple....clean....and much more 'do-able' at 72 .. ;)  ;) ...if I was in my 50's or 60's I'd build something a bit more "grandiose"... :o  ;D ...

But it is what it is.... and as such - Today (Friday) I went about reconfiguring the layout according to the NEW TRACK PLAN... :o  :o  ;D  ;D ...(ya'll knew that was coming).... ;D  ;D  ;D ....it's actually pretty cool and concise, it'll give me continous running, and a built in - '2 trains a day' need in order to service both the "I Me Mine' gold mine and Scavenger Inc. at Blackrock, ... ;D  ;D and the depot, 2 industries, and the D&RGW interchange at Dilapidated.....plus..... :o

Trains headed to Blackrock MUST back out of Grizzly and down to Po. Dunk Jct.  ;D  ;D  ;D  then forward and take the branch line up to Blackrock... after working Blackrock- leave going forward, taking the main line all the way down to Grizzly ;)  ;) .... and trains going to Dilapidated leave going forward on the main line all the way to Dilapidated, work the D&RGW intchg. then the sidings-and then forward to take the branch line down to Po-Dunk Jct. to return to Grizzly- switching to the main line at Po-Dunk Jct. and backing the rest of the way into Grizzly.... :o  :o  ;D  ;D  ;)  ;) both trains back into trailing switches to work the respective sidings....easy-peasie, one train to Blackrock in the morning, and one train to Dilapidated in the afternoon ........I love it......simple one man operations, and continous running for 'funzies'... ;D  ;D  ;D  ;D ......pictures below of the plan and the progress made today.... ;D  ;D  ;D

Track plan...........................(sideways...sorry) :o  :o
006.JPG

Blackrock....so far.......
001.JPG

Po-Dunk Jct. ...so far......
002.JPG

Dilapidated and the D&RGW intchg......so far.....
003.JPG

That's all for now .....I'm tired ..... ;D  ;D ..it's 12:24 AM CST (Sat. morning)  :o  :o and I'm gonna grab a little 'shut-eye' before the dirt starts flying again tomorrow, er, uh, today Saturday......
thanx again for stoppin' by........see ya......... 8)  8)  8)  8)  8)
 
KYLE CREEL
G&D Ry. Co.

PRR Modeler

Interesting Kyle. Simpler is often a better solution than complex.
Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

Larry C

Kyle glad you saw the track problem before you went much further. So 10th time the charm?
Current Projects: O'Neils Mercantile & Repair
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

elwoodblues

Kyle, you're making great progress.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

kyle creel

Thanx Curt, thanx Larry C*., and thanx Ron....

I finished working on the project for today (Saturday) .... ;D  ;D ...I have all but two sections of foam risers glued in place, and went ahead and mocked everything else up for fit and appearance.... ;D  ;D  ;D ...

This week I'll work on getting the remaining risers and roadbed glued down, then I'll finish soldering the track sections together and attach feeders to them before gluing them down.... ;D  ;)  ;) ....

I can already tell that this incarnation of the G&D is gonna be one that I really enjoy... ;D  ;D  ;)  ;) ....I'm getting the images in my head together regarding the scenery, and have decided what to do on the backdrop to enhance the whole 'picture'..... ;D  ;)  ;) ......here's some shots of todays' efforts......hope they look OK.....

Dilapidated.......
003.JPG
007.JPG

Blackrock.........
005.JPG
012.JPG

Po-Dunk Jct. .....
004.JPG
013.JPG

That about winds it up from this end, thanx again for stoppin' by .......see ya..... 8)  8)  8)  8)  8)

KYLE CREEL
G&D Ry. Co.


deemery

I'm looking forward to seeing how you 'scenic-in' the arch bridge.  That's certainly a dramatic piece on the layout.

dave
Modeling the Northeast in the 1890s - because the little voices told me to

Michael Hohn

Kyle,

The scenic possibilities are almost endless.

Mike

friscomike

Howdy Kyle,

Congrats on the simplified layout plan.  I've always found it easier to have a structure completed or at least a mockup when finalizing placement, elevations, etc.  Glad you can envision the final layout design.

Have fun,
mike

Jerry

Kyle that arch bridge should be a real focal point.
Looking forward on how you scenic it.

Jerry
"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

kyle creel

#594
Thanx Dave, thanx Michael, thanx Mike, and thanx Jerry;...and a big 'ol thanx to everybody that just grabbed a look-see  ;D  ;D  ;D  ;D .....

Today (Sunday) I decided that the I Me Mine bldg was blocking too much of the scenery of 'Woods' Ridge behind it, and Scavenger Inc. was also too 'overbearing' and blocking a good view of 'The Arch' in the rock formation behind it.... >:(  >:(  >:( ....so I took a nap and I figured out that all I really need for a 'mine theme' spot in that area is a loading structure - something simple.... ;D  ;D  ;D .....the mine itself is 'off stage' in the viewers mind... ;)  ;)  ;)  :o  ;D ....and so I found a piece of the curved 'trestle works' from the old mine scene I was gonna build last year and positioned it so that all the tailings are brought across the trestle and dumped into the waiting ore cars to be hauled away...the gold is transported under armed guard by truck from the mine to the mine office in Blackrock and then loaded into an REA boxcar and shipped to Grizzly for transfer to the std. gauge for shipping elsewhere ..;D  ;D  ;D ...I also moved Scavenger Inc. from Blackrock over to Dilapidated and moved Phartz & Schmelling from Dilapidated across to Blackrock where its' 'personality' :o  ;D  ;D  ;D  ::) isn't so 'obtrusive'....in Dilapidated the townsfolk were a bit less than enamored with the 'aroma' of the odorizers produced to add to natural gas so gas leaks can be detected... ::)  ;D  ;D  ;D  ;D  ;)  ;) .....pictures below........all for now ....thanx again for stoppin' by......see ya....... 8)  8)  8)  8)

KYLE CREEL
G&D Ry. Co.

The new 'I Me Mine' transfer trestle at Blackrock................
003.JPG
Phartz & Schmelling at Blackrock.................................
002.JPG
A start on the 'scenery idea' for the branchline run up to Blackrock
008.JPG
A 'new look' Dilapidated.........................................
004.JPG
006.JPG
007.JPG

Hope the shots look OK................ 8)  8)  8)  8)  8)  8)



kyle creel

Here's a shot of the 'whole enchilada'........  :o  ;D  8).................
The layout height is 56"....all the new 'stuff' is a max of 5" higher......or 61"...............
009.JPG

Philip


Jerry

"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

Powered by EzPortal