2026-2026 Winter Challange - OVL Co. Maintenance Buildings

Started by elwoodblues, January 06, 2026, 09:56:20 PM

Previous topic - Next topic

elwoodblues

This is a project that I've been thinking about for years.  On one area of my layout is a logging camp, the Okanagan Valley Lumber Company Camp #4.  Along the back of the camp are three maintenance buildings that serve the camp.  The buildings are serviced by a rail siding.  The company owns a couple of 18ft boxcars that bring supplies to the camp.

The buildings that are planned for the service building were produced by Sierra West Scale Models.  They are as follows,
- Tool Shed
- Rigging Shed
- Line side Storage Shed

2026 Challange Trackplan.jpg

These will be built on a common platform so that unloading the boxcars will be easier for the camp workers.  The area where is will go is 24" x 4"



2026 challange-001.jpg
The location of the challenge build, the building complex will go behind the siding.



2026 challange-002.jpg
The boxcars that deliver supplies to the lumber camp.

I started building the tool shed years ago but the project has been in limbo since then as other layout priorities took precedence.  I'm going to use the current winter challenge as the motivation to finally complete this build.



2026 challange-004.jpg
The platform for the tool shed.  This was built according to the instructions.  Seeing as there will be three building involved this will not be used, but will form the basis for the new platform that will support the three buildings.



2026 challange-003.jpg
The walls for the tool shed are already built.  The challenge I have going forward will be completing the building as I no longer know where the instructions are.  :o 

Before I start though, I need to complete the current boxcar build I'm doing.  I have to start learning to complete one project before moving on to the next project.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Mark Dalrymple

Looks like a neat project, Ron.

I really like those 18' box cars.  very cute.

QuoteI have to start learning to complete one project before moving on to the next project.

I have this same condition.  I fear my case may be terminal!

Cheers, Mark.


elwoodblues

Mark,

Those 18ft boxcars were produced by Boulder Valley Models, who unfortunately are no longer in business.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Jerry

Ron this should be a nice setting using those 3 kits.
And you already off to a good start.

Jerry
"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

Larry C

Ron looking forward to your builds and should be a nice addition to your layout. It'll be fun watching you build 3 SW kits in 4 months; good luck.
Owner & CEO of
Jacobs' Landing: A Micro On18 Layout
Current Projects: Hank's Machine Shop
                            2025 Winter Callenge

http://www.ussvigilant.blogspot.com

Jim Donovan

Ron;

Welcome to the Winter Challenge, another great project, I have my popcorn ready along with a diet coke so looking forward to following along.

Jim
Holland & Odessa Railroad

TravisSumm

Ron,

I have the instructions for the Tool Shed if you need them. 

Just email me and I can scan them in.  Travis.summit@gmail.com


Zephyrus52246

Your railroad plan looks like it would be fun to operate.  Looking forward to your build. 

Jeff


elwoodblues

Quote from: Jerry on January 07, 2026, 10:47:43 AMRon this should be a nice setting using those 3 kits.
And you already off to a good start.

Jerry
Thanks Jerry,

Not as good of a start as shown, as the dock will be rebuilt to allow for the three buildings to sit on it, but it is still a good start.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Larry C on January 07, 2026, 11:45:53 AMRon looking forward to your builds and should be a nice addition to your layout. It'll be fun watching you build 3 SW kits in 4 months; good luck.
Larry, thanks and you are right, building 3 Sierra west kits in for months might be a stretch, but nothing like a deadline to motivate someone.  ;D
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Jim Donovan on January 07, 2026, 12:43:31 PMRon;

Welcome to the Winter Challenge, another great project, I have my popcorn ready along with a diet coke so looking forward to following along.

Jim
Thanks Jim.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: TravisSumm on January 07, 2026, 11:50:03 PMRon,

I have the instructions for the Tool Shed if you need them. 

Just email me and I can scan them in.  Travis.summit@gmail.com


Travis, thanks for the instruction offer, but I was lucky and found a set.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

elwoodblues

Quote from: Zephyrus52246 on January 08, 2026, 09:38:51 AMYour railroad plan looks like it would be fun to operate.  Looking forward to your build.

Jeff
Jeff, the layout is fun to operate.  Now that I no longed travel for work, my goal is to re-establish operating sessions on the layout.
Ron Newby
General Manager
Clearwater Valley Railroad Co.
www.cvry.ca

Rick

I'm going to enjoy following along as you build this project.
Have fun!

Powered by EzPortal