Superior & Seattle Railroad Build (Volume 2) Started 2/25/17

Started by S&S RR, February 25, 2017, 10:03:31 PM

Previous topic - Next topic

ak-milw


S&S RR

Curt and Andy


Thanks for stopping by the thread. I am having a great time with my family.
John Siekirk
Superior & Seattle Railroad

S&S RR

Quote from: S&S RR on February 26, 2017, 09:12:29 PM



Index to Volume 1 of the  Superior & Seattle Railroad Build Thread

Index to the thread Updated 3/21/17. 



                          INDEX


Page 1   Changing forums - the benchwork
Page 2   Overview and Status in March of 2014
Page 3   A look back at the Benchwork and Paster work on the mountains,
             Painting the Plaster work
             The Photo Back Drops
             Making Aspen Trees
Page 4    Making Pine Trees
              Preparing the Talus Materials
Page 5    Prototype Photographs
Page 6    Prototype Photographs
              Control Panel
Page 7    Layout Diagram "original plan"
              Roundhouse Photographs
              The Stone Roundhouse Build - start
Page 8    Stone Roundhouse Build - the walls
Page 9    Stone Roundhouse Build - the Roof
Page 10  Stone Roundhouse Build - Painting
Page 11  Laying more track
             Planning the town of Sellios
Page 12  Testing track
Page 13  First Runs - lower track
Page 14  Benchwork and Town layout - Sellios
Page 15  Benchwork and Town layout - Sellios
Page 16  Track work in Sellios
Page 17  Planning Structure Placement - Sellios
Page 18  Logo for the Superior & Seattle Railroad
Page 19  Cedar Shingle Pine Tree armatures
              Modeling in the Summer
Page 20  Roofing on the Stone Roundhouse
Page 21  Doors on the Stone Roundhouse
Page 22  More plaster work
Page 23  Installing the DCC System
Page 24  DCC System Discussion
Page 25  DCC System Installation
Page 26  DCC System Installation
Page 27  More track installation
Page 28  Track Testing
Page 29  Door production for the Stone Roundhouse
Page 30  Ballasting The Eagles Nest Yard
Page 31  Ballasting The Eagles Nest Yard
Page 32  Changes - moving mountains
Page 33  Adding some talus materials
Page 34  Stone Roundhouse Build - Tar Paper Roof
Page 35  Stone Roundhouse Build - Doors, Windows, Trim
Page 36  Planting Aspen Trees,
             prototype pictures Aspen Trees
Page 37  Stone Roundhouse Build Trim, Front Stone Work
             Pictures of Mountains with Fall Color
Page 38  The view through "Wayne's hole"
Page 39  Some overall room photographs of the layout
Page 40  Stone Roundhouse Build - Painting the trim
Page 41  Stone Roundhouse Build - Installing the Windows
Page 42  The A&I tube
Page 43  Stone Roundhouse Build - Painting the Roof
Page 44  Stone Roundhouse Build - Final pictures on the workbench
              Stone Roundhouse Build - Moving and installing on the layout
Page 45  Stone Roundhouse Build - Installation pictures
Page 46  Discussion of storage on the benchwork
Page 47  New - flex shaft rotary tool
Page 48  The Eagles Nest Yard
Page 49  Kit discussion
Page 50  Scenery on Mt. Aiden
Page 51  Mt. Aiden Trestle Build - bents
Page 52  Testing coloring for the Trestle
Page 53  Start of scenery on Mt. Aiden
Page 54  Progress pictures scenery on Mt. Aiden
Page 55  Surveying for the Trestle
             Stripwood for the Mt. Aiden Trestle
             Casting the footings for the Mt. Aiden Trestle
Page 56  Changes in the Mountains
Page 57  Coloring the trestle footings
Page 58  Mt. Aiden Scenery progress pictures
Page 59  Setting the footings for the Mt. Aiden Trestle
Page 60  Mt. Aiden Trestle Build first Bents
Page 61  Staining Stripwood
Page 62  Mt. Aiden Trestle Build
Page 63  Mt. Aiden Trestle Build
Page 64  Trestle Build progress pictures
Page 65  Trestle Build progress pictures
Page 66  Painting Bolt Castings
Page 67  Installing Bolt Castings - Mt. Aiden Trestle
Page 68  Cutting more strip wood
              Dealing with impatient forum members
Page 69  Adding retaining walls
Page 70  Trestle Build progress pictures
Page 71  Counting nut and bolt castings
Page 72  Mt. Aiden Trestle - the finishing process
Page 73  Adding Scenery to Mt. Aiden
Page 74  Building retaining wall for Mt. Aiden
              Pine Tree Production
Page 75  Dead Pine Trees
Page 75  The Brambell's Build Start - What's in the box
Page 76  Brambell's - Site preparation on the Layout
Page 77  Brambell's - Making Extra Castings
Page 78  Brambell's - Changing the site plan to fit my location on the layout.
Page 79  Brambell's - Making Molds
Page 80  Brambell's - Painting the castings
Page 81  Brambell's - Preparing the background scenery
Page 82  FSM Sawmill reconditioning for the S&S RR.
Page 83  Brambell's - Fitting castings to my site.
Page 84  Brambell's - Castings - lessons learned
Page 85  Brambell's - Painting the castings
Page 86  Brambell's - Testing the base with castings on the layout
Page 87  Brambell's - Detail castings - preparation for painting

             Brambell's - The warehouse walls
Page 88  New Tools
Page 89  Brambell's - Warehouse Assembly
Page 90  Brambell's - Painting the detail castings
             Brambell's - The wood retaining wall
Page 91  Brambell's - More Warehouse Assembly
Page 92  Brambell's - adding detail castings
Page 93  Brambell's - Warehouse Roof Construction
Page 94  Brambell's - Adding the Hoist House
              Brambell's - Adding the back deck
              Brambell's - A test fit on the layout
Page 95  Brambell's - Adding the ground cover
Page 96  Brambell's - Adding the Warehouse back shed
Page 97  Brambell's - More details
Page 98  Brambell's - Building the front deck
Page 99  Brambell's - Building the Trestle
Page 100 Brambell's - The cement wall
              Brambell's - The Trestle Deck
Page 101 Updating the index
Page 102 Brambell's - Rail Siding and Dock
              Adding more trees
Page 103 Brambell's Front Office
Page 104 Brambell's Scale and Scale House
Page 105 Brambell's Adding Dirt
              Brambell's Test Plant on Layout
Page 106 Changes, Dad's, and the old layout
Page 107 Working in the Mountain
Page 108 Brambell's The Details
Page 108 Brambell's Finish Pictures on the Workbench
Page 108 A clean workbench
Page 109 Chippy Hollow Build Start
Page 110 Another Trestle Build
Page 111 More Pine Tree Production
               Chippy Hollow Painting the wall castings
Page 112 Start of the Mt. Aiden Small Trestle
Page 112 Eagles Nest Hardware Build
Page 114 Track on the Mt. Aiden Trestle
Page 114 Chippy Hollow Build Progress
Page 115 Eagles Nest Warehouse Wall Castings
Page 116 Build Progress Eagles Nest Warehouse and Chippy Hollow
Page 117 Painting the Eagles Nest Warehouse Castings.
Page 118 Progress Report Small Trestle Build on Mt. Aiden.
Page 118 Layout Diagrams update
Page 119 Chippy Hollow Build update.
Page 120 Reusable Mold Material test.
Page 121 Trestle Build Progress.
Page 123 Final Pictures Mt. Aiden Trestle Build.
Page 124 Eagles Nest Warehouse Progress Report.
Page 126 Chippy Hollow Build Update
Page 128 Chippy Hollow Details
Page 128 Chippy Hollow become Walter P's
Page 129 The Staging Yard.

Page 130 The Control Panel Switch Panel.
Page 133 Eagles Next Warehouse - new paint and weathering.
Page 134 Start of the Jacob's Coal Build.
Page 136 Prototype Pictures from Greenfield Village
Page 137 Making room for the inside the mountain helix.
Page 138 Building the Helix.
Page 142 Making molds for plaster castings.
Page 143 More Aspen Trees
Page 146 Start of the C. C. Crow Stone Church Build
Page 147 Making room for the HOn3 Trestle
Page 148 Plans for the mountain top.
Page 148 Hidden Yard Build
Page 150 C. C. Crow Church Pictures
Page 153 Starting the HOn3 Trestle Builds
Page 155 Jacob's Coal Build Update
Page 157 Getting out the saw - more changes
Page 159 Using a Clay Mockups for design.
Page 162 The Start of the town of Sellios
Page 163 Sawmill placement.
Page 164 More on the Clay Mockup.
Page 167 Future Build Plans.
Page 169 The HOn3 Trestle Final Build Pictures.
Page 171 More Aspen Trees
Page 172 Moving on to Volume 2 of the S&S RR Build.



Index to Volume 2

Page 1  Indexes
Page 1  Adding more Aspen Trees
Page 2  The clay mockup and the final helix.
Page 3
John Siekirk
Superior & Seattle Railroad

jerryrbeach

John,
Thanks so much for taking the time to plan and post an index.  That makes it SO much easier to find a specific part of the thread.
Jerry

sdrees

Hi John,

It looks like a beautiful Fall day with the leaves turning on the Aspen trees in the mountains.  Pretty soon the snow will be falling.
Steve Drees
SP RR

S&S RR

Quote from: jerryrbeach on March 22, 2017, 09:13:47 AM
John,
Thanks so much for taking the time to plan and post an index.  That makes it SO much easier to find a specific part of the thread.


Jerry


Thanks for following along and your welcome on the index.  I use it myself when I'm trying to remember how I did something.  Especially with paint colors.
John Siekirk
Superior & Seattle Railroad

S&S RR

Quote from: sdrees on March 22, 2017, 12:35:28 PM
Hi John,

It looks like a beautiful Fall day with the leaves turning on the Aspen trees in the mountains.  Pretty soon the snow will be falling.

Hi Steve


Thanks for stopping by the thread.
I plan on sticking with a nice sunny fall day.  If I ever model snow it will be on a different area of the layout.



John Siekirk
Superior & Seattle Railroad

S&S RR

This past week I have only been doing some design work on the layout - mostly structure placement. This week, I  should get back to work on the helix and track work. Between road trips and family obligations there hasn't been much time for modeling. Variety is the spice of life ;) .
John Siekirk
Superior & Seattle Railroad

S&S RR

Today, I returned from my road trip with the last stop being a visit to Erieman's - MORRISTOWN & ERIE RAILROAD - WESTERN DIVISION.  I met Frank through the forum a few years ago and we have become good friends.  This was my third visit to his layout and he has made tremendous progress in the two years since my last visit.  Frank is getting his layout ready for a photo shoot and it is truly a "Great Model Railroad". One of the things that caught my eye as I walked in the door was the pine trees.  Frank arranged a trip to see his supplier for the trees - Don Ledger.  Don really knows how to model trees. I thoroughly enjoyed the discussions we had about trees and forest modeling and I'm looking forward to receiving the samples he will be sending me based on our discussions.  I think his trees are going to really complement the caspia pine trees that I have been making for the S&S RR. Here is a photograph of one of one of the trees from Frank's layout.


John Siekirk
Superior & Seattle Railroad

Mkrailway

So John when are you going to make one, or two, or three ...?

KCS Trains


S&S RR

Quote from: MartyO on March 30, 2017, 12:01:24 AM
So John when are you going to make one, or two, or three ...?


Marty


When it comes to trees on my layout we always think in terms of 100's. I think these will really complement the caspia trees. I will post pictures when the samples arrive.
John Siekirk
Superior & Seattle Railroad

S&S RR

Quote from: KCS Trains on March 30, 2017, 11:30:23 AM
That my friend, is a great tree!!!  Phil


Phil


Thanks for stopping by the thread - yes I think Don is really doing a great job with these.  Amazing what you can do with a piece of rope.
John Siekirk
Superior & Seattle Railroad

PRR Modeler

Curt Webb
The Late Great Pennsylvania Railroad
Freelanced PRR Bellevue Subdivision

S&S RR

John Siekirk
Superior & Seattle Railroad

Powered by EzPortal